Installation Material

Banner Installation Material 

Woodward delivers Installation Material to site each according to erection phase

Woodward interfaces with other engineering tools virtually (3D-based) early in the electrical engineering phase to detect collisions, reducing them during actual building. In addition, Woodward engineers deliver components and supervise construction on site.

 
 
Contact Information

Woodward Power Solutions GmbH
Krefelder Weg 47

47906 Kempen -Germany

service-ps@woodward.com
phone: +49 (0) 2152/145-358

sales-ps@woodward.com
phone: +49 (0) 2152/145-203


Power Solutions References
A Selection of References
Show »
Power Solutions Flyer
A Brief Overview
Show »
Follow us on LinkedIn Follow us on Facebook Follow us on Twitter