505 Family
5418-7833GUI_OBJ_C.zip
Executable GUI Software for the 505DR control product. This application can be loaded onto the control using AppManager. This GUI file is specifically designed to work only with GAP 5418-7833GAP Revision C.System Requirements:
- Pentium® PC
- 32 MB of RAM
- Windows® 2000, XP, Vista, 7 or greater
Installation Instructions:
-
Update the GAP and GUI applications using the following procedure:
- If unit has been configured: Download the current tunable settings file from the control. If unfamiliar with using Control Assistant, refer to 505 manual 26839V2, Appendix E for step-by-step instructions on “Retrieving Control Tunables” from the 505.
- If unfamiliar with using AppManager, refer to 505 manual 26839V2, Appendix F for step-by-step instructions.
- In the Control application view panel, Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar.
- Switch to the GUI application view panel (brown background) and Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar. The status of this application will now say Stopped.
- The display on the control will switch to the 505 splash screen when no GUI is running.
- Switch back to the Control application view panel.
- Under Control menu, select Transfer Application Files.
- In the dialog box that opens browse to find the new GAP executable file named: 5418-7833GAP_<Rev>.out
- When transfer is complete, select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
- Switch to the GUI application view panel (brown background) by using the Swap button on the right side Toolbar (or Control/Show GUI Applications View)
- Under Control menu select Transfer GUI applications.
- In the dialog box that opens browse to find the new GUI file named: 5418-7833_<Rev>_build01.wgui.
- When transfer is complete (takes about a minute), select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
- GUI initialization will take about 2 minutes.
- If unit was configured: Upload the current tunable settings file (from step 1) from your PC into the control. Refer to 505 manual 26839V2, Appendix E, “Sending Control Tunables”.
- Procedure complete. Both application files are now in AutoStart, and the control will boot up normally after any power cycle.
Download:
Item | Name | Version | Size | |
---|---|---|---|---|
5418-7833GUI.OBJ
|
505 Family
|
C
|
4.25 MB
|