505 Family
5418-6768_OBJ_F.zip
Executable GAP Software for the 505D. This application can be loaded onto the control using AppManager.
This file is compatible with GUI p/n 5418-6947.
This file requires that the control hardware is using Footprint p/n 5418-6479 (verify in AppManager)
System Requirements:
Installation Instructions:
Update the GAP and GUI applications using the following procedure:
- If unit has been configured: Download the current tunable settings file from the control. If unfamiliar with using Control Assistant, refer to 505 manual 26839V2, Appendix E for step-by-step instructions on “Retrieving Control Tunables” from the 505.
- If unfamiliar with using AppManager, refer to 505 manual 26839V2, Appendix F for step-by-step instructions.
- In the Control application view panel, Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar.
- Switch to the GUI application view panel (brown background) and Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar. The status of this application will now say Stopped.
- The display on the control will switch to the 505 splash screen when no GUI is running.
- Switch back to the Control application view panel.
- Under Control menu, select Transfer Application Files.
- In the dialog box that opens browse to find the new GAP executable file named: 5418-6768_<Rev>.out
- When transfer is complete, select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
- Switch to the GUI application view panel (brown background) by using the Swap button on the right side Toolbar (or Control/Show GUI Applications View)
- Under Control menu select Transfer GUI applications.
- In the dialog box that opens browse to find the new GUI file named: 5418-6947_<Rev>_build01.wgui.
- When transfer is complete (takes about a minute), select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
- GUI initialization will take about 2 minutes.
- If unit was configured: Upload the current tunable settings file (from step 1) from your PC into the control. Refer to 505 manual 26839V2, Appendix E, “Sending Control Tunables”.
- Procedure complete. Both application files are now in AutoStart, and the control will boot up normally after any power cycle.
Download:
Item | Name | Version | Size | |
---|---|---|---|---|
5418-6768.OBJ
|
505 Family
|
F
|
1.74 MB
|