Flex200
5418-7345_OBJ_D.zip
Peak200
(control p/ns 8200-1500, 01, 02, …, 09)
GUI Application 5418-7345 for the Peak200. This application can be loaded onto the control using AppManager.
GUI Application 5418-7345 for the Peak200. This application can be loaded onto the control using AppManager.
System Requirements:
Windows® Vista, 7, 8, 10
Installation Instructions:
Update the GAP and GUI applications using the following procedure:
1. If unit has been configured: Download the current tunable settings file from the control. If unfamiliar with using Control Assistant, refer to Peak200 manual 35051, Appendix E for step-by-step instructions on “Retrieving Control Tunables” from the Peak200.
2. If unfamiliar with using AppManager, refer to Peak200 manual 35051, Appendix F for step-by-step instructions.
3. In the Control application view panel, Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar.
4. Switch to the GUI application view panel (brown background) and Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar. The status of this application will now say Stopped.
5. The display on the control will switch to the Peak200 splash screen when the GUI application is not running.
6. Switch back to the Control application view panel.
7. Under Control menu, select Transfer Application Files.
8. In the dialog box that opens browse to find the new GAP executable file named: 5418-7275_<rev>.out.
9. When transfer is complete, select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
10. Switch to the GUI application view panel (brown background) by using the Swap button on the right side Toolbar (or Control/Show GUI Applications View)
11. Under Control menu select Transfer GUI applications.
12. In the dialog box that opens browse to find the new GUI file named: 5418-7345_<rev>_build01.wgui.
13. When transfer is complete (takes about a minute), select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
14. GUI initialization will take about 2 minutes.
15. If unit was configured: Upload the current tunable settings file (from step 1) from your PC into the control. Refer to Peak200 manual 35051, Appendix E, “Sending Control Tunables”.
16. Both application files are now in AutoStart, and the control will boot up normally after any power cycle.
17. Procedure complete.
2. If unfamiliar with using AppManager, refer to Peak200 manual 35051, Appendix F for step-by-step instructions.
3. In the Control application view panel, Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar.
4. Switch to the GUI application view panel (brown background) and Stop the application by selecting Control/Stop Application or the Maroon Square button on the right side Toolbar. The status of this application will now say Stopped.
5. The display on the control will switch to the Peak200 splash screen when the GUI application is not running.
6. Switch back to the Control application view panel.
7. Under Control menu, select Transfer Application Files.
8. In the dialog box that opens browse to find the new GAP executable file named: 5418-7275_<rev>.out.
9. When transfer is complete, select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
10. Switch to the GUI application view panel (brown background) by using the Swap button on the right side Toolbar (or Control/Show GUI Applications View)
11. Under Control menu select Transfer GUI applications.
12. In the dialog box that opens browse to find the new GUI file named: 5418-7345_<rev>_build01.wgui.
13. When transfer is complete (takes about a minute), select the file and start the application by selecting Control/Start Application or the Blue Triangle button on the right side Toolbar.
14. GUI initialization will take about 2 minutes.
15. If unit was configured: Upload the current tunable settings file (from step 1) from your PC into the control. Refer to Peak200 manual 35051, Appendix E, “Sending Control Tunables”.
16. Both application files are now in AutoStart, and the control will boot up normally after any power cycle.
17. Procedure complete.
Download:
Item | Name | Version | Size | |
---|---|---|---|---|
5418-7345.OBJ
|
Flex200
|
D
|
1.40 MB
|